Friday, Nov 22nd

You are here: English Research Areas and Projects Research on the Supply Planning of the Electric Power Industry in the 12th Five-Year Plan

Research on the Supply Planning of the Electric Power Industry in the 12th Five-Year Plan

E-mail 打印 PDF

 

Research on the Supply Planning of the Electric Power Industry in the 12th Five-Year Plan

 

 

Contents

 

1. Introduction

1.1 Research Goals

1.2 Research Tools

1.3 Report Structure

 

2. Methodology

2.1 Literature Review

2.2 Introduction to Methodology

2.3 Research Steps

 

3. Research Steps

3.1 Non-Fossil Resource Installed Capacity in the“12th Five-Year Plan”Period

3.2 New Installed Capacity in the“12th Five-Year Plan”Period

3.3 Begin Construction and Carry-Over Installed Capacity in the“12th Five-Year Plan”Period

3.4 The Influence of Environmental Restriction

3.5 The Calculation of CO2 Emission Intensity in the Electric Power Industry

 

4. Basic Parameter and Hypothesis

4.1 The Costs of Power Generation Technology

4.2 The Current Scale of Power Generation Technology

4.3 The Returned Scale of Power Generation Technology

4.4 The Exploitable Scale of Power Generation Technology

4.5 Technology Index of the Electric Power Industry

4.6 Demand Forecast of Electric Power

4.7 The Goals of Power Generation Technology Ratio of Non-Fossil Resources

 

5. The Supply Planning of the Electric Power Industry in the“12th Five-Year Plan”Period

5.1 New Installed Capacity of the Electric Power Industry in the “12th Five-Year Plan” Period

5.2 Start Construction and Carry-Over Installed Capacity of the Electric Power Industry in the“12th Five-Year Plan”Period

 

6. The Influence of Environmental Restriction on the Development of the Electric Power Industry

 

7. The Situation of CO2 Emission in the Electric Power Industry

 

8. Conclusion and Policy Suggestion